A 12" Ballgrab PLRT with dewatering and pig catching capability was used to recover 10 lengths of pipe from 1350m of water. The last piece was dewatered and lifted at a load of 350mT into a "J" lay tower and a pig was caught in Ballgrab pig catcher.

Pipeline Recovery Tool for Nigeria Project