Customer
|
Year
|
Application
|
QTY
|
| Stena |
1993 |
10" pipeline recovery 147 tonne SWL |
2 |
| Stena |
1993 |
12" pipeline recovery 147 tonne SWL |
2 |
| Stena |
1994 |
12" pipeline recovery 91 tonne SWL |
1 |
| Stena |
1994 |
10" pipeline recovery 91 tonne SWL |
1 |
| Stena |
1995 |
4" pipeline recovery 25 tonne SWL |
1 |
| Stena |
1996 |
4" Ballgrab |
2 |
| Stolt Comex |
1996 |
8" Ballgrab 25-tonne SWL |
1 |
| Stena |
1996 |
30" Ballgrab 25-tonne SWL |
1 |
| Stena |
1996 |
16" Ballgrab with seal for dewatering line |
1 |
| Stena |
1996 |
10" Ballgrab 200-tonne SWL |
1 |
| E.M.C. |
1997 |
16" Ballgrab recovery system 200-tonne SWL |
1 |
| Stena |
1998 |
6" pipeline recovery system 100-tonne SWL |
2 |
| Stena |
1998 |
8" pipeline recovery system 75-tonne SWL |
2 |
| Stolt Comex |
1998 |
8" Ballgrab 35-tonne SWL |
3 |
| Stena |
1998 |
12 " pipeline recovery system 57-tonne SWL |
2 |
| Stena |
1998 |
228mm Ballgrab 40-tonne SWL |
2 |
| Stolt Comex |
1998 |
4" Ballgrab 25-tonne SWL (RENTAL) |
1 |
| DSND |
1998 |
6" 120-tonne SWL recovery Ballgrab |
2 |
| DSND |
1998 |
8" 120-tonne SWL recovery Ballgrab |
1 |
| DSND |
1998 |
12" 200-tonne SWL recovery Ballgrab |
1 |
| DSND |
1998 |
A & R Ballgrab 200-tonne SWL |
1 |
| Pt Komaritim |
1999 |
16" Ballgrab 10-tonne SWL |
1 |
| E.M.C. |
2000 |
8" recovery tool SWL |
1 |
| Stolt Offshore |
2000 |
8" recovery tool with seal |
1 |
| Stolt Offshore |
2000 |
8" A&R Ballgrab and receptacle |
1 |
| Coflexip Stena Offshore |
2000 |
6" Ballgrab |
1 |
| Coflexip Stena Offshore |
2000 |
A&R Ballgrab |
1 |
| Stolt Offshore |
2000 |
12" Ballgrab 250-tonne SWL |
1 |
| Petrobras |
2001 |
8" Ballgrab recovery system with seal |
1 |
| Petrobras |
2001 |
12" Ballgrab recovery system with seal |
1 |
| Peak Intervention |
2001 |
6" Ballgrab 65-tonne SWL |
1 |
| Coflexip Usa |
2001 |
12", 450-tonne A&R tool – Ballgrab and receptacle |
1 |
| Coflexip Usa |
2001 |
16", 450-tonne A&R tool – Ballgrab and receptacle |
1 |
| Coflexip Usa |
2001 |
18", 450-tonne A&R tool – Ballgrab and receptacle |
1 |
| Stolt Offshore |
2001 |
10" pipeline recovery tool |
1 |
| Petrobras |
2001 |
200 tonne A&R BG/R |
1 |
| Shell/ Halliburton |
2001 |
10 tonne Ballgrab |
6 |
| Sonsub Clough |
2001 |
20 tonne Ballgrab |
1 |
| Magnox Electric |
2002 |
Ballgrab wagr decomissioning tool – 600kg proof load |
1 |
| Stolt Halliburton |
2002 |
10" Ballgrab |
1 |
| Halliburton |
2002 |
12" Ballgrab |
1 |
| Stolt/ Peak |
2002 |
50 tonne Ballgrab |
1 |
| Technip Offshore Contractors Inc |
2003 |
14" and 18" PLRT for Devils Tower |
2 |
| Technip Coflexip |
2003 |
8" and 10" PLRT for Matterhorn |
2 |
| Technip Coflexip |
2003 |
6" PLRT for King West |
1 |
| Global Industries |
2003 |
30" PLRT |
1 |
| Stolt Offshore |
2003 |
8" PLRT |
6 |
| Stolt Offshore |
2004 |
12" PLRT on Bonga |
1 |
| Stolt Offshore |
2004 |
10", 16" and 20" PLRT with seals and PIG catchers on Benguela Belize |
1 |
| Acergy |
2006 |
4", 6", 8", 10" and 12" PLRT on Okume Oveng |
1 |
| Acergy |
2006 |
10", 16" and 18" PLRT with dewatering on Tyrihans |
3 |
| Subsea 7 |
2007 |
12" PLRT on Girassol |
5 |
| Saipem |
2007 |
10" PLRT on Burullus |
3 |
| Subsea 7 |
2008 |
6", 8", 10" and 12" PLRT on Tombua Landana |
4 |
| Sonsub |
2008 |
1.66" PLRT, 2" PLRT, 4" PLRT, 12" PLRT and 24" PLRT on Total Frigg decommisioning |
5 |
| Acergy |
2008 |
4" and 12" PLRT for Volund |
2 |
| SONSUB |
2008 |
1 off 6" PLRT and 2.5" PLRT for recovery of flexible risers on Aquila |
2 |
| Saipem |
2009 |
1 off 10" PLRT with dewatering on Sequoia |
1 |
| Technip |
2009 |
5" and 14" PLRT on Gjøa |
2 |
| Technip |
2009 |
12" PLRT on Babbage Development |
1 |