+44 (0)1524 387 777

 Image Gallery

   

Mooring

     
Subsea Mooring Systems

Figure_5___First_Subsea_Female_SMC_in_pile_docking_porch.jpg

Figure 6 - First Subsea Male SMC and Polyester Rope Mooring Winch.JPG

ThunderHawk120.JPG

First Subsea Female SMC

in pile docking porch

 First Subsea Male SMC and polyester rope mooring winch  Thunderhawk

 

 

 Floating Platform Production
Clip_2.jpg Perdido pile and First Subsea SMC schematic_1.jpg   Perdido pile and First Subsea Female SMC in docking porch_1.jpg

Suction pile showing docking porch with female mooring connector

(Maari Project)

 Perdido pile and First Subsea SMC schematic
 

Perdido and First Subsea

SMC in docking porch 

 

  

   
Submerged Buoy Production   
DSCN5901.JPG  Vincent_STP_with_First_Subsea_Ballgrab_female_connectors.jpg 

Mooring_Connector_for_Buoy.jpg

 

STL buoy male

Ballgrab mooring connector

Vincent STP with Ballgrab

female connectors

Ballgrab mooring line

connection for buoy

 

  

 Mooring Line Jewellery - LankoFirst
 
LankoFirst_image_from_brochure_2.jpg
 
Clam1_3.jpg Clam2.jpg Clam3.jpg

Clam 1

 

Clam 2

 

Clam 3

 


 

  

Flexible Risers and Umbilicals  

 
Diverless Bend Stiffener Connectors
24_inch_installation_004_2.jpg SDC10054v2.jpg SDC10104v2.jpg

First Subsea Diverless Bend Stiffener Connector

 

 

Neptune DBSC ready

for installation

 

 

Neptune DBSC Connector

showing Bend Stiffener

 

 


  

  

Pipelines and Cables

 
 Pipeline Recovery Tools  
P5160033_2.jpg 100_0629.JPG First_Subsea_PLRT.jpg

 Pipeline Recovery Tool

Pipeline Recovery Tool 'ready for action' 

 

 Pipeline Recovery Tools

on standby


 

 

  

Subsea Intervention and Handling

     
Autoswage   
First_Subsea_Autoswage.jpg autoswage.jpg autoswage_detail.jpg
Schematic of Autoswage pipe bend connector

Autoswage

Connector Elements

Pipe inserted from the left

is gripped by the Autoswage

connector's balls.

     

 

Buoy Pick Up
Buoy_pick_up_Scenario_1.jpg Scenario_2.jpg Scenario_3.jpg Scenario_4.jpg

FPSO in

position over the turret buoy

Male connector being lowered from the FPSO to the turret

buoy

Male connector's camera detecting the position of the female connector Turret buoy being lifted into the FPSO using the subsea connector
       

 

  

Renewable Energy

 

Image_1_from_Q6385_pdf.jpg Picture15.jpg Picture27.jpg
Tidal Power Wave Power Offshore Wind