Our Mooring Tools
First Subsea have worked closely with clients on over 40 mooring projects, suppling many hundreds of connectors across the world to the offshore wind, oil and gas industries. With mooring systems installed for more than 20 years, we have built up a wealth of mooring knowledge and experience.
First Subsea’s Platform Mooring Connector (PMC) is specifically designed for floating offshore wind platforms, simplifying mooring line installation and disconnection. First Subsea’s PMC is suitable for integration with any floating structure or mooring line design, and provides an instantaneous quick connection and disconnection of the mooring line with minimal intervention.
Key Features:
Removes the need for expensive chain jacks and fairleads
Proven track record of installation, disconnection and re-installation
Suitable for both low or high installation loads
Reduces offshore installaton time
Provides an instantaneous and automatic storm safe connection


First Subsea’s Platform Mooring Connector (PMC) for TLPs, offers a quick connect solution for TLP tendons to the offshore structure. First Subsea’s TLP PMC allows the tendons to be quickly connected, adjusted and disconnected from the offshore structure, whilst providing multiple degrees of freedom for operational loading conditions.
Key Features:
Adjustable mooring line length/tension
Provides multiple degrees of freedom
High load capacity
Provides an instantaneous and automatic storm safe connection
Reduces offshore installation time

First Subsea’s Subsea Mooring Connector (SMC) provides a quick connect solution of the mooring line to a subsea structure such as a suction or driven pile. First Subsea’s SMC has a long track record, and is ideally suited for longer term installations and also applications where disconnection and re-connection criteria are required.
Key Features:
Proven track record of installation, disconnection and re-installation
Provides an instantaneous and automatic storm safe connection
High load capacity
Cost effective solution for mooring line connections
Reduces offshore installation time